builddar.
Request a demo
Feature · Aftercare and warranty

Claims and interventions connected to the building history

Property aftercare software tracks each buyer claim from triage to closure: work order, appointment, contractor report, signed intervention record, and buyer sign-off (quitus). In Builddar, six automatic reminders, including one at 48 hours for the contractor and one at 24 hours for the buyer, escalate to the manager.

Product feature Updated 13 October 2026 Published by Builddar 7 min read
Contents
  1. The minimum journey for a controlled intervention
  2. Turn a claim into a technical action
  3. Assign and follow the intervening contractor
  4. Close with a signed intervention record
  5. Recover context produced during construction
  6. Property aftercare and intervention questions

The minimum journey for a controlled intervention

  • Qualify the request before sending it to a contractor.
  • Retain dwelling, room, description, photographs, and relevant warranty context.
  • Record assignment, appointment, and intervention outcome.
  • Sign the record and make it available in the buyer portal.

Turn a claim into a technical action

The buyer’s initial message is not always enough to start an intervention. The team checks the address, room, nature of the defect, photographs, and context before deciding the appropriate treatment.

Qualification prevents incomplete transfers and separates an information request, an item still open from handover, and a matter that needs a contractor visit.

Assign and follow the intervening contractor

The contractor receives a precise request with the dwelling, location, supporting evidence, and intervention objective. Scheduling retains proposed dates, confirmations, and any postponements.

After the visit, the result, photographs, and comments join the same file. If the issue remains unresolved, a further action can be created without deleting the first intervention.

  • Qualified request and dwelling context
  • Assigned contractor and transmitted information
  • Appointment, confirmation, and change history
  • Report, photographs, and intervention outcome
  • Buyer signature and closure decision

Close with a signed intervention record

The record identifies the request, date, attending contractor, and completed work. The buyer’s signature records attendance and the result observed during the appointment.

In Builddar, the signed record is archived in the buyer space and remains connected to the claim. Customer teams retain a continuous chronology from request to closure.

Recover context produced during construction

When a request resembles an earlier snag, history can provide the location, trade, photographs, and prior actions. Aftercare teams do not start only from the message received after handover.

This continuity distinguishes an isolated ticket tool from building lifecycle management. It strengthens the file without assuming that every buyer claim necessarily had a known origin during construction.

Property aftercare and intervention questions

Control a request through to signed closure

Connect claims, contractors, appointments, evidence, and closure in the Builddar developer journey.

Explore intervention tracking